INTRODUCTION

The goal of this Policy issue brief is to highlight key general and specific sectoral requirements for establishing and managing an SPV as a private limited lability or Public Company in Nigeria. To achieve this goal, this brief outlines the legal and regulatory requirements that are of general and sector-specific application for establishing and managing SPVs in Nigeria's telecom sector: it provides examples of SPV practiced in non-telecom sectors; it identifies key challenges and prefer recommendation to foster a competitive Sustainable, and resilient telecommunications infrastructure deployment framework.

HIGHLIHTS OF KEY GENERAL AND SPECIFIC REQUIREMENTS FOR ESTABLISHING AND MANAGING SPV THAT IS EITHER PRIVATE LIMITED LIABILITY OR PUBLIC LIMITED COMPANY IN NIGERIA

General Corporate Requirements for SPVs under the Company and Allied Matters Act (CAMA) 2020

The Companies and Allied Matters Act, 2020 serves as the principal legislation governing the formation, operation, and dissolution of companies,[1] including SPVs, in Nigeria. Under CAMA 2020, an SPV is usually registered as a private limited liability company or, in some cases, a public limited company,[2] depending on the scope and financing requirements of the project.The choice of legal structure depends on the nature of the project and the funding requirements. CAMA 2020 stipulates that an SPV must have a memorandum and articles of association defining its specific purpose, objectives, and governance structure.[3] The law also mandates proper corporate governance practices, including the appointment of directors[4], details of shareholders, and company secretary,[5] proof of registered office address, compliance with financial reporting requirements, [6]and adherence to transparency and accountability standards. Additionally, CAMA 2020 provides for the protection of creditors and investors by ensuring that SPVs maintain adequate financial disclosure and adhere to insolvency provisions to mitigate financial risks.

Once incorporated, an SPV must maintain statutory compliance by filing annual returns, keeping[7] proper financial records, and adhering to corporate governance principles as stipulated under CAMA 2020. Corporate governance requirements include transparency in financial reporting, adherence to the duties and responsibilities of directors, and ensuring shareholder rights are protected. SPVs must also comply with tax obligations under the Federal Inland Revenue Service (FIRS) regulations, which include value-added tax (VAT), company income tax (CIT), and withholding tax requirements.

The SPV must be registered with the Corporate Affairs Commission (CAC) and adhere to corporate governance standards, including the appointment of at least one director for a private company and three for a public company.[8]

Additionally, the SPV must maintain statutory records, such as registers of members, directors, and secretaries (where applicable), and file annual returns with the CAC.[9] Compliance with financial reporting obligations, including the auditing and filing of financial statements, is mandatory, particularly for public SPVs.[10] Furthermore, the SPV must ensure that its name reservation, share capital structure, and business objectives align with regulatory expectations to avoid sanctions or dissolution.[11]

A private limited liability SPV is restricted from inviting the public to subscribe to its shares and must have a minimum of one shareholders and one director.[12] In contrast, a public limited SPV must have more shareholders, directors, a company secretary, and a minimum share capital as prescribed by regulatory bodies.[13] Public SPVs must also comply with stricter disclosure and corporate governance requirements under the Nigerian Code of Corporate Governance.[14]

Typically, in Nigeria, persons involved in projects opt for entities known as Special Purpose Vehicles (SPV) through which such projects may be executed. These SPVs may either be incorporated or unincorporated companies but there is a preference for incorporated SPVs due to the legal benefits attached. The Companies and Allied Matters Act, 2020 (CAMA) is the principal legislation for the formation and management of Companies in Nigeria. The CAMA provides for the capacity to form a company, types of companies and other corporate organisations including Incorporated Trustees and Limited Liability Partnerships. Further provisions cover the types of companies, and the management of companies including Directors, Meetings, Minority Protection and Corporate Restructuring among other requirements.

Under the CAMA SPVs are required to be established either as public companies or private companies. It provides for three different types of companies each of which may either be a public company or a private company.[15] They are-

                            (a)            Public company limited by Shares;

                           (b)            Private company limited by Shares;

                            (c)            Public company limited by Guarantee;

                           (d)            Private company limited by Guarantee;

                            (e)            Public unlimited Company; and

                            (f)            Private Unlimited Company.

Below are some of the requirements for establishing and managing an SPV-

                 (i)            Two or more persons (individual or legal entities) are empowered to form a public company as an SPV or a single person where the SPV is to be a private company. However, regardless of the type of the company, the purpose to be pursued upon incorporation must be a lawful one,[16]

               (ii)            Where an individual is to join in the formation of a company, he or she should have attained 18 years if two other persons involved in the formation have not attained 18 years. They are required to be of sound mind and financial standing,

             (iii)            A memorandum of association of the company mentioning the name, nature of the business, type of company, registered office address, amount of share capital (minimum of N100,000 and 2,000,000 for a private or public company respectively) and particulars of subscribers,[17]

             (iv)             Articles of Association to be contained in a single document and divided into numbered paragraphs which may include any restriction as to the object of the company,

               (v)            Particulars of directors and a secretary for public companies or a director for a private company,

             (vi)            Exemption considerations for foreign companies that may be part of the SPVs along with work and residence permits for expatriate officers of the foreign companies,[18] and

           (vii)            Corporate governance considerations for public companies particularly the appointment of directors and separation of the office of the Managing Director/CEO and the Chairman of Board of Directors, meetings of companies, and financial reporting requirements.

It is important to observe at this point that aside from CAMA, the Investments and Securities Act 2025, capital market Regulations and Codes provides other requirements for public companies seeking listing on the Nigerian Stock Exchange (NSE) regarding inviting the members of the public to purchase their securities.

Sectoral Regulations For SPVs-PPPs In Infrastructure Deployment

This section will briefly examine the sectorial regulations for use of SPV’s in infrastructure deployment and establishment of SPVs under a  PPP framework

Specific sector requirements under the ICRC Act, 2005 as a PPP Structured SPV: -

One of the primary goals of Government is to provide basic social amenities, public infrastructure and utilities for its citizenry. However, the constraints of funds and the evidence of private sector contribution to public infrastructure development has given birth to the concept of Public Private Partnership (PPP). Through PPP, the Government is able to enter into a contractual relationship on agreed terms and conditions with a private company to provide specific basic public infrastructure and leverage on opportunities to attract private expertise or capital, increase efficiency, utilise available resources to provide needed public infrastructure and introduce sectoral reforms.

In Nigeria, PPP is regulated principally by the Infrastructure Concession Regulatory Commission (Establishment, etc.) Act, 2005 (ICRC Act). The ICRC Act established the Infrastructure Concession Regulatory Commission (ICRC) to regulate, monitor and supervise infrastructure and development projects.[19] The ICRC Act was enacted to facilitate the participation of the private sector in financing the development, operation, or maintenance of infrastructure or development projects of the federal government through concession or contractual arrangements,[20] it applies only to investment and development projects relating to any infrastructure of the Federal Government MDAs.[21] Aside from being regulated primarily by the ICRC Act,  SPVs which are structured as PPP projects  in Nigeria are additionally regulated by sector-specific laws depending on the sector. Most relevant to this paper is the Nigeria Communications Act, 2003.

The ICRC Act stipulates the following requirements for an SPV structured a PPP-

    (a)            prioritisation of infrastructure projects by relevant Ministry, Department or Agency (MDA) to be submitted to the Federal Executive Council (FEC) for approval as concession projects;[22]

   (b)            vetting the financial capacity, expertise and experience of the Project Proponent in undertaking such infrastructural project;[23]

    (c)            publication of projects that are eligible for concession in the national gazette and in at least three national dailies with wide circulation;[24]

   (d)            upon approval by the FEC, the relevant MDA invites open competitive public bidding for the approved priority projects by publication in at least three national newspapers having wide circulation in Nigeria;[25]

    (e)            award of concession to be only to the bidder whose bid satisfied the pre-qualification criteria and is the most technically and economically comprehensive;[26]

    (f)            preparation and execution of concession contract to cover-

(i)     duration of the concession,[27]

(ii)   where the awardee is a consortium, joint liability of all members of the consortium,

(iii) amount and period for payment to the government,[28]

(iv) amortisation plan for repayment of the project cost,[29]

(v)   the special account into which shall be paid all monies accruing to the government,[30]

(vi) the power of the ICRC and the relevant MDA to inspect any asset under the project,[31] and

(vii)           the supremacy of provisions of the ICRC Act;

   (g)            the relevant MDA shall authenticate the project cost and any other relevant professional body;[32]

   (h)            insuring the concession project by the contractor or project-proponent as approved by NAICOM;[33]

     (i)            the relevant MDA is responsible for the supervision of the concession project;[34] and

     (j)            grant of such right of way to the contractor as may be necessary or reasonable for the execution of the concession project.[35]

SPVs in Public-Private Partnerships and the ICRC Act: - SPVs play a significant role in infrastructure development and PPP arrangements, particularly under the Infrastructure Concession Regulatory Commission Act, 2005 (ICRC Act). [36]The ICRC Act provides the legal framework for private sector participation in public infrastructure projects through concession agreements, build-operate-transfer (BOT) arrangements, and other partnership models.[37] These arrangements are essential in bridging the infrastructure deficit in Nigeria by leveraging private sector expertise and financing for critical projects such as roads, railways, airports, and energy facilities.

Under the ICRC Act, an SPV established for a PPP project must be structured to ensure risk allocation between the public and private sectors while maintaining financial sustainability. This requires a clear delineation of responsibilities, with the government typically assuming regulatory oversight and policy direction while the private sector partner focuses on project execution, funding, and operational efficiency. The regulatory requirements include obtaining approval from relevant government agencies, compliance with procurement laws, and adherence to contractual obligations under the PPP agreement.

The ICRC Act further mandates that SPVs in PPP projects meet financial viability tests, maintain proper project governance structures, and ensure operational efficiency. Financial viability assessments are conducted to determine whether the project can generate sufficient revenue streams to cover operational costs and deliver expected returns to investors. [38]This ensures that PPP projects remain commercially sustainable while fulfilling public service obligations.

Regulatory and Compliance Requirements for SPVs in PPPs: -The establishment of an SPV under a PPP framework involves a rigorous regulatory approval process. Before commencement, the project must undergo an extensive feasibility study, which assesses technical, financial, legal, and socio-economic viability. This study serves as the basis for obtaining approvals from relevant government bodies, including the Federal Executive Council (FEC) for large-scale projects or the respective state government authorities for subnational initiatives.[39]

Furthermore, SPVs engaged in PPP projects must comply with Nigeria’s public procurement regulations, including the Public Procurement Act, 2007.[40] This law mandates transparency, competition, and fairness in the bidding and contracting process for infrastructure projects. SPVs must also adhere to performance monitoring mechanisms established by the ICRC, which include periodic reporting, financial audits, and operational reviews to ensure compliance with contractual terms. Another key requirement under the ICRC Act is the establishment of governance structures that promote accountability and efficient decision-making within the SPV. This involves setting up  a board of directors with representation from both public and private sector stakeholders, appointing experienced management teams, and ensuring that governance frameworks align with international best practices. Additionally, SPVs in PPP projects must adhere to environmental, social, and sustainability requirements. These include conducting Environmental and Social Impact Assessments (ESIAs) to mitigate potential negative effects on local communities and the environment. Compliance with these requirements is crucial in maintaining public trust and securing long-term project success.

The role of SPVs in Nigeria’s infrastructure development through PPPs is crucial in addressing funding gaps and ensuring efficient project execution. The legal and regulatory framework provided by the ICRC Act establishes a structured approach to risk allocation, financial sustainability, and governance in PPP projects. Compliance with regulatory requirements, including obtaining necessary approvals, adhering to procurement laws, and maintaining sound governance structures, is essential for the successful operation of SPVs in PPP arrangements. By aligning with these legal provisions, SPVs can contribute significantly to Nigeria’s economic growth by facilitating sustainable infrastructure development and public service delivery.

Investment and Securities Act (ISA) 2025

The ISA 2025 repeals the 2007 Act and introduces transformative reforms for Nigeria’s capital markets, with direct implications for ICT/digital infrastructure financing.

Key Provisions of ISA 2025 and ICT Sector Implications

The ISA 2025 introduces transformative reforms with three key provisions impacting Nigeria's digital economy. First, it formally recognizes digital assets as securities, bringing cryptocurrencies, asset-backed tokens (like fibre optic bonds), and STOs under SEC regulation, replacing the CBN's restrictive approach. Second, it modernizes financial market infrastructure by legitimizing blockchain trading platforms for telecom assets and enabling smart contracts for ICT PPPs. Third, it strengthens investor protections through stricter disclosure requirements for tech startups and mandatory cyber-risk reporting for listed ICT firms, aligning with Nigeria's Data Protection Act.

These changes create significant opportunities for Nigeria's ICT sector. The Act unlocks new financing mechanisms, allowing infrastructure SPVs to issue blockchain-based digital securities and liberalizing crowdfunding for rural broadband projects. Telecom giants like MTN and Airtel can now securitize fibre assets, while states may fund smart city initiatives through digital bonds. However, challenges remain, including potential regulatory overlaps between SEC, CBN and NCC, and unresolved tax treatment of digital asset transactions.

To maximize benefits, stakeholders should adopt strategic approaches. Regulators must harmonize digital asset rules across agencies and establish fintech sandboxes. Telecom operators should explore asset tokenization and SEC-compliant crowdfunding. Investors and startups should closely monitor upcoming SEC guidelines while utilizing smart contracts for transparent deals. These coordinated efforts will determine how effectively Nigeria harnesses ISA 2025 to accelerate its digital transformation while managing associated risks.

Regulatory and Tax Compliance

SPVs must obtain necessary sector-specific licenses, particularly if operating in regulated industries such as finance, energy, or infrastructure. Tax compliance under the Companies Income Tax Act (CITA) and Value Added Tax (VAT) Act is essential, including timely remittance of taxes and filing returns with the Federal Inland Revenue Service.[41] Additionally, SPVs involved in cross-border transactions must comply with Foreign Exchange (Monitoring & Miscellaneous Provisions) Act and Central Bank of Nigeria (CBN) regulations.

Finally, establishing and managing an SPV in Nigeria requires strict adherence to CAMA 2020, sector-specific regulations, and tax laws. While private SPVs benefit from fewer regulatory burdens, public SPVs face stricter governance and reporting obligations. Proper structuring, compliance, and corporate governance are critical to ensuring the SPV’s legality and operational efficiency.

 

EXAMPLES OF SPV EXPERIENCE IN NIGERIA

Electric Power Cable Infrastructure Deployment

In the power sector, SPVs have been instrumental in facilitating large-scale infrastructure projects. A notable example is the Lagos-Ibadan Transmission Line Project, where an SPV was established to manage the financing and deployment of high-capacity transmission cables. This project, backed by a consortium of local and international investors, aimed to improve electricity supply between Lagos and Ibadan. The SPV structure allowed for risk isolation, ensuring that the project's financial obligations were separate from the parent companies. Additionally, the Azura-Edo Power Plant utilized an SPV to secure project financing and manage the construction of a 450MW gas-fired power plant. The SPV model enabled the project to attract foreign investment and adhere to regulatory requirements, demonstrating its effectiveness in Nigeria's power sector.

Oil and Gas, Banking, Finance, and Capital Markets/Insurance

In the oil and gas sector, SPVs have been widely used for joint ventures and project financing. For instance, the Egina Floating Production Storage and Offloading (FPSO) Project, operated by TotalEnergies, involved an SPV to manage the financing and operational risks associated with the deepwater oil field. The SPV structure ensured that the project's liabilities were ring-fenced, protecting the parent company's balance sheet. In the banking and capital markets sector, SPVs have been utilized for securitization and structured finance. For example, United Bank for Africa (UBA) and Access Bank have used SPVs to issue asset-backed securities (ABS) and mortgage-backed securities (MBS), enabling them to unlock liquidity from illiquid assets. Similarly, in the insurance sector, SPVs have been employed for catastrophe bonds and risk transfer mechanisms, such as the Nigerian Agricultural Insurance Corporation (NAIC), which used an SPV to manage risks associated with agricultural insurance portfolios.

Construction (Transport: Road, Rail, Water/Maritime, Air) and Real Estate

In the construction and transport sectors, SPVs have played a critical role in public-private partnerships (PPPs). The Lagos-Ibadan Expressway project, managed by an SPV, involved collaboration between the federal government and private investors to upgrade the critical transport corridor. [42] The Lekki Toll Gate is operated as a Special Purpose Vehicle (SPV) under the Lekki Concession Company Limited (LCC).Also,the LCC was established as an SPV to finance, develop, operate, and maintain the Lekki-Epe Expressway and the Lekki-Ikoyi Link Bridge under a Public-Private Partnership (PPP) agreement with the Lagos State Government. The SPV model allowed LCC to raise funds for the construction and maintenance of the road infrastructure while generating revenue through toll collection.[43]

Similarly, the Abuja Light Rail Project utilized an SPV to oversee financing, construction, and operations, ensuring that the project remained bankruptcy-remote and financially viable.[44] In the maritime sector, the Lekki Deep Sea Port project, developed through an SPV, attracted significant foreign investment and streamlined the construction process. In real estate, SPVs have been used for large-scale developments, such as the Eko Atlantic City project, where an SPV was established to manage the financing and construction of the multi-billion-dollar city reclamation project. These examples highlight the versatility of SPVs in addressing complex infrastructure and real estate challenges in Nigeria.[45]

Asset Management Corporation of Nigeria (AMCON)

While AMCON is not explicitly labeled as an SPV, it operates in a manner similar to one. AMCON was established to address the non-performing loan (NPL) crisis in Nigeria's banking sector by acquiring bad debts from banks and managing them separately. This isolation of assets (non-performing loans) from the banks' balance sheets is a key characteristic of SPVs. By acting as a quasi-SPV, AMCON helps stabilize the financial system, protects banks from insolvency risks, and ensures that the acquired assets are managed and resolved efficiently. Its role in securitizing and restructuring distressed assets aligns with the core functions of an SPV, even though it operates on a larger, government-backed scale.[46]

RMB Nigeria Issuance SPV PLC

This is a classic example of an SPV used in the banking and capital markets sector. RMB Nigeria Issuance SPV PLC was incorporated specifically to facilitate fundraising activities for RMB Nigeria through the issuance of debt securities in the public capital markets. The SPV structure allows RMB Nigeria to isolate the risks associated with the debt issuance, ensuring that the parent company's balance sheet remains unaffected. This SPV is a clear demonstration of how SPVs are used in structured finance to raise capital, enhance creditworthiness, and comply with regulatory requirements. It also highlights the role of SPVs in enabling financial institutions to access long-term funding for business expansion and development.

Freezone Global Investments Ltd (OGFZA's SPV)

Freezone Global Investments Ltd is the investment subsidiary of the Oil and Gas Free Zones Authority Nigeria (OGFZA). As an SPV, it is specifically designed to manage investments and projects within Nigeria's oil and gas free zones. The SPV structure allows OGFZA to isolate financial and operational risks associated with these investments, ensuring that the parent organization (OGFZA) is not directly exposed to liabilities. This SPV plays a critical role in attracting foreign direct investment (FDI) into Nigeria's oil and gas sector by providing a secure and regulated framework for investors. It also facilitates the development of infrastructure and industrial projects within the free zones, contributing to economic growth and job creation.

These examples—AMCON, RMB Nigeria Issuance SPV PLC, and Freezone Global Investments Ltd—demonstrate the diverse applications of SPVs in Nigeria across banking, capital markets, and the oil and gas sector. Each entity serves a specific purpose, such as managing non-performing loans, raising capital, or facilitating investments, while maintaining risk isolation and regulatory compliance. These examples highlight the versatility and importance of SPVs in Nigeria's economic landscape.

SPVs for Mining Sector (Federal Government Initiative)

The article[47] from BusinessDay highlights the Federal Government's creation of Special Purpose Vehicles (SPVs) to boost state participation in mining activities. These SPVs are designed to facilitate joint ventures between the federal government, state governments, and private investors in the mining sector. The SPV structure allows for risk-sharing, efficient resource allocation, and regulatory compliance while ensuring that the financial and operational risks associated with mining projects are isolated from the participating entities. This initiative aims to unlock the potential of Nigeria's solid minerals sector, attract investment, and promote economic diversification. The use of SPVs in this context demonstrates their role in public-private partnerships (PPPs) and sector-specific development projects.

Sukuk SPVs under the Securities and Exchange Commission (SEC)

The sukuk (Islamic bond) transactions facilitated by SPVs are another excellent example. The Securities and Exchange Commission (SEC) oversees sukuk issuances in Nigeria, which are often structured through SPVs to ensure compliance with Islamic finance principles. For instance, the Nigeria Sovereign Sukuk issued by the federal government for infrastructure development is managed through an SPV. This SPV issues the sukuk, manages the funds raised, and oversees the construction of infrastructure projects such as roads, bridges, and other public utilities. The SPV structure ensures that the funds are ring-fenced and used exclusively for the intended projects, providing transparency and accountability to investors. This example also ties into the construction sector, as the proceeds from sukuk issuances are typically used to finance large-scale infrastructure projects.[48]

Sukuk SPVs for Construction Sector

The sukuk SPVs are particularly relevant to the construction sector, as they are often used to finance critical infrastructure projects. For example, the N100 billion Sukuk Issuance by the federal government in 2017 was managed through an SPV and allocated to the construction and rehabilitation of 25 major road projects across Nigeria. The SPV structure ensures that the funds are bankruptcy-remote and protected from the financial risks of the issuing entity (in this case, the federal government). This model has been replicated in subsequent sukuk issuances, demonstrating the effectiveness of SPVs in mobilizing long-term capital for infrastructure development. The sukuk SPVs also align with global best practices in Islamic finance, making them attractive to both domestic and international investors.

SPV-Public-Private Partnership (PPP) Model

The PPP model involves collaboration between government agencies and private sector companies. This model can leverage private investment and expertise while maintaining public oversight. The PPP structure could be designed as a Build-Operate-Transfer (BOT) or Build-Own-Operate (BOO) agreement[49]

a)    Advantages: Access to private financing, shared risks, and expertise in operations.

b)    Challenges: Potential for conflicts of interest and complex negotiation processes.

c)    Strategic risk management is critical in mitigating potential challenges such as regulatory changes, financing hurdles, and operational delays. Developing a comprehensive risk management framework that includes contingency planning will be vital for the SPV’s success.[50]

Nigeria Liquefied Natural Gas (NLNG)

a)    Established in 1989 to harness Nigeria's natural gas resources.

b)    Operates under the Nigerian Gas Master Plan and relevant laws, including the NLNG Act as a limited liability company jointly owned by four shareholders; the Federal Government of Nigeria represented by NNPC Ltd (49%), Shell (25.6%), Total Energies (15%), and Eni (10.4%). The Private Sector own 51% of the Shares of NLNG.

c)    Governed by contracts with the Nigerian government and international partners.

d)    Regulatory Compliance: NLNG operates within the framework of Nigerian laws, adhering to regulations from government bodies, including the Department of Petroleum Resources (DPR) and the Nigerian Content Development and Monitoring Board (NCDMB).

Nigeria Inter-Bank Settlement System PLC (NIBSS):

NIBSS provides a shared interbank payment infrastructure to facilitate electronic interbank funds transfers and settlements

The Current Governing Structure of NIBSS (Nigeria Inter-Bank Settlement System) includes: -

a)    Shareholders: NIBSS is owned by banks operating in Nigeria, with shares distributed among commercial and development banks which play a crucial role in Nigeria's payment systems.

b)    Board of Directors: Similar to NLNG, NIBSS has a Board responsible for governance, with representatives from member banks and independent directors to provide oversight and strategic direction.

c)    Executive Management: The day-to-day operations and implementation of strategies are led by a Managing Director/CEO, supported by an executive management team focused on technology, finance, operations, and stakeholder relations.

d)    Committees: NIBSS has various committees (e.g., audit, risk management) to handle specific governance functions, ensuring adherence to regulatory requirements and operational efficiency.

e)    Regulatory Oversight: NIBSS is overseen by the Central Bank of Nigeria (CBN), ensuring it complies with national regulations governing the payment systems and financial transactions.

NIBSS significantly contributes to financial inclusion in Nigeria by enhancing the payments infrastructure, reducing transaction costs, facilitating interoperability, and promoting financial literacy. By fostering an environment where digital financial services are accessible to all, NIBSS helps integrate more individuals and businesses into the formal financial system, ultimately leading to economic growth and development.

REGULATORY GAPS

Lack of a Dedicated SPV Regulation

While SPVs operate under the Companies and Allied Matters Act (CAMA) 2020, no specific regulatory framework comprehensively governs their establishment, operation, and dissolution. Unlike some jurisdictions that have stand-alone SPV laws, Nigeria relies on general corporate and financial regulations, which may not adequately address the unique risks associated with SPVs, such as asset isolation, bankruptcy remoteness, and regulatory oversight. A dedicated SPV regulation could clarify the permissible structures, minimum capitalisation, and reporting requirements for various SPVs, including those used in securitisation, public-private partnerships (PPPs), and project finance.

Unclear Tax Treatment and Incentives

Nigeria's tax laws, particularly the Companies Income Tax Act (CITA) and Value Added Tax (VAT) Act do not provide explicit tax incentives or exemptions tailored for SPVs. In other jurisdictions, SPVs used for infrastructure financing or securitisation benefit from tax neutrality provisions that prevent double taxation or excessive tax burdens on asset transfers, interest payments, and dividend distributions. The absence of precise tax treatment for SPVs in Nigeria increases transaction costs and discourages widespread adoption. Addressing this gap through specific tax incentives would enhance their viability, particularly for capital market transactions and infrastructure development.

Insolvency and Bankruptcy Protection Limitations

Although CAMA 2020 provides for corporate insolvency, it lacks explicit provisions on the bankruptcy remoteness of SPVs. In structured finance, isolating SPV assets from the bankruptcy of the Sponsor or Originator is crucial to ensuring investor confidence. While Nigerian courts may recognise the principle of actual sale in asset-backed transactions, no statutory safeguard prevents creditors from claiming SPV-held assets in insolvency proceedings. Strengthening legal protections around bankruptcy remoteness would enhance the attractiveness of Nigerian SPVs in international financial markets.

Regulatory Overlap and Fragmentation

SPVs in Nigeria may fall under multiple regulatory bodies, including the Securities and Exchange Commission (SEC), the Central Bank of Nigeria (CBN), the Nigerian Stock Exchange (NSE), and the Infrastructure Concession Regulatory Commission (ICRC) for PPP-related SPVs. This fragmented regulatory environment creates compliance burdens and uncertainties, as different agencies may impose conflicting or overlapping requirements. A streamlined regulatory framework, possibly under a unified SPV law or guidelines, would improve regulatory efficiency and reduce bureaucratic bottlenecks.

Lack of Investor Protection and Governance Standards

There are limited governance and investor protection mechanisms specific to SPVs in Nigeria. Unlike in jurisdictions where SPVs are subject to strict governance rules to ensure transparency and fiduciary responsibility, Nigeria relies on general corporate governance rules under CAMA, which may not be sufficient for entities handling large-scale securitisation or infrastructure projects. Enhancing governance requirements, such as independent directorship, mandatory disclosures, and investor protection mechanisms, would improve SPV's credibility and facilitate capital market participation.

CHALLENGES

The establishment and management of Special Purpose Vehicles (SPVs) in Nigeria are governed by a complex legislative and regulatory requirements framework. While these requirements are designed to ensure transparency, accountability, and investor protection, they also present several challenges that can hinder the effective use of SPVs in structured finance, securitisation, and public-private partnerships (PPPs). Below is an analysis of the general challenges associated with these requirements:

Regulatory Fragmentation and Overlap

One of the primary challenges in establishing and managing SPVs is the fragmentation and overlap of regulatory frameworks. SPVs are subject to multiple laws and regulations, including the Companies and Allied Matters Act (CAMA) 2020, the Securities and Exchange Commission (SEC) Rules, the Central Bank of Nigeria (CBN) Guidelines, and sector-specific regulations such as the Infrastructure Concession Regulatory Commission (ICRC) Act. This multiplicity of regulations often leads to conflicting requirements, creating confusion for SPV managers and increasing compliance costs. For example, an SPV involved in securitisation may need to comply with both the CBN's risk retention rules and the SEC's disclosure requirements, which may not always align.[51]

Complexity of Compliance Requirements

The legislative and regulatory requirements for SPVs are often highly complex and technical, posing significant challenges to compliance. For instance, Section 40(1) of CAMA 2020 requires SPVs to maintain detailed records of their financial transactions, while Section 156 of the CBN Guidelines on Securitization imposes additional reporting obligations on SPVs issuing asset-backed securities. These requirements demand specialised accounting, law, and risk management knowledge, which may not always be readily available within the SPV's management team. The complexity of these requirements can lead to errors in compliance, exposing SPVs to regulatory penalties and reputational risks.[52]

High Cost of Compliance

The cost of complying with legislative and regulatory requirements is another significant challenge for SPVs. Establishing an SPV involves significant legal, administrative, and financial costs, including registration fees, licensing fees, and the cost of engaging legal and financial advisors. Additionally, ongoing compliance requirements, such as filing annual returns, preparing audited financial statements, and submitting periodic reports to regulatory authorities, further increase the financial burden on SPVs. These costs can be particularly prohibitive for smaller SPVs or those involved in low-value transactions, limiting their ability to participate in structured finance and securitisation activities.[53]

Inconsistent Enforcement of Regulations

Another challenge for SPVs in Nigeria is the inconsistent enforcement of regulations by regulatory authorities. While the legislative and regulatory frameworks provide clear guidelines for establishing and managing SPVs, enforcing these guidelines often varies across different regulatory bodies. For example, the SEC may impose strict penalties for non-compliance with disclosure requirements, while the CBN may adopt a more lenient approach to enforcing risk retention rules. This inconsistency creates uncertainty for SPV managers and undermines the effectiveness of the regulatory framework.[54]

Limited Capacity of Regulatory Authorities

The limited capacity of regulatory authorities to effectively oversee SPVs is another significant challenge. Regulatory bodies such as the SEC, CBN, and ICRC often lack the resources, expertise, and infrastructure e needed to monitor and enforce compliance with legislative and regulatory requirements. This limitation can result in delays in the approval of SPV transactions, inadequate oversight of SPV operations, and a lack of timely intervention in cases of non-compliance. The limited capacity of regulatory authorities also hinders their ability to provide guidance and support to SPV managers, further exacerbating compliance challenges.[55]

Taxation Challenges

Taxation is another area of concern for SPVs in Nigeria. While Section 29(8) of the Companies Income Tax Act (CITA) provides exemptions for SPVs engaged in qualifying securitisation transactions, the application of these exemptions is often inconsistent and subject to interpretation by tax authorities. Additionally, SPVs must comply with withholding tax obligations under Section 10(1) of CITA, which can create administrative burdens and increase the cost of transactions. The lack of clarity in tax regulations and the potential for double taxation further complicate the tax compliance process for SPVs.[56]

Lack of Awareness and Expertise

Many stakeholders, including SPV managers, investors, and regulatory authorities, lack awareness of the legislative and regulatory requirements for SPVs. This lack of awareness often results in non-compliance, errors in establishing and managing SPVs, and disputes between stakeholders. Additionally, there is a shortage of expertise in structured finance, securitisation, and SPV management in Nigeria, further limiting the ability of SPVs to comply with regulatory requirements and achieve their objectives.[57]

Dispute Resolution Mechanisms

Another challenge is the lack of effective dispute resolution mechanisms for SPVs. While Section 18(4) of the ICRC Act provides for establishing dispute resolution mechanisms in PPPs, these mechanisms are often underutilised or ineffective. Disputes between SPVs, originators, investors, and regulatory authorities can lead to delays in project implementation, increased costs, and reputational damage. The absence of a robust dispute resolution framework undermines investor confidence and hinders the growth of the SPV market in Nigeria.[58]

CONCLUSION

Establishing and managing Special Purpose Vehicles (SPVs) in Nigeria play a pivotal role in driving structured finance, securitisation, and public-private partnerships (PPPs), all of which are essential for economic growth and infrastructure development. However, the current legislative and regulatory landscape presents significant challenges, including regulatory fragmentation, high compliance costs, inconsistent enforcement, and limited capacity of regulatory authorities. These challenges hinder the effective use of SPVs and limit their potential to contribute to Nigeria's economic transformation.

Addressing these challenges requires a coordinated and multi-faceted approach. Streamlining regulatory frameworks, simplifying compliance requirements, reducing costs, and enhancing enforcement mechanisms are critical steps toward creating a conducive environment for SPVs. Additionally, building awareness and expertise, improving tax clarity, strengthening dispute resolution mechanisms, and leveraging technology will further enhance the efficiency and transparency of SPV operations. Public-private collaboration and investor confidence-building measures will also play a crucial role in unlocking the full potential of SPVs to mobilise capital, drive infrastructure development, and foster financial innovation.

By implementing these recommendations, Nigeria can overcome the existing barriers and position itself as a hub for structured finance and securitisation in Africa. A well-regulated and efficiently managed SPV market will attract domestic and foreign investment and support sustainable economic growth, job creation, and improved service delivery in critical sectors. Ultimately, the success of SPVs in Nigeria will depend on the commitment of policymakers, regulatory authorities, and industry stakeholders to work together to create a robust and resilient financial ecosystem.

RECOMMENDATIONS

A multi-faceted approach is required to address the challenges associated with Nigeria's legislative and regulatory requirements for Special Purpose Vehicles (SPVs). This approach should streamline regulations, enhance enforcement mechanisms, build capacity, and foster stakeholder collaboration. Below are specific recommendations to improve the establishment and management of SPVs in Nigeria:

Streamline Regulatory Frameworks

Harmonize Laws and Regulations: The government should establish a task force to harmonise the various laws and regulations governing SPVs, such as the Companies and Allied Matters Act (CAMA) 2020, the Securities and Exchange Commission (SEC) Rules, and the Central Bank of Nigeria (CBN) Guidelines. This task force should eliminate overlaps, resolve conflicts, and create a unified regulatory framework for SPVs. Develop a Single Regulatory Body: Consider creating a single regulatory body or a dedicated unit within an existing agency (e.g., SEC or CBN) to oversee all SPV-related activities. This would reduce fragmentation and ensure consistent enforcement of regulations.

Simplify Compliance Requirements

Standardise Reporting Templates: Regulatory authorities should develop standardised reporting templates for SPVs to simplify compliance with disclosure and reporting requirements. These templates should be user-friendly and tailored to the specific needs of SPVs involved in securitisation, structured finance, and PPPs. Provide Clear Guidelines: Regulatory bodies should issue clear and detailed guidelines on establishing and managing SPVs, including step-by-step instructions for compliance with legal and regulatory requirements. These guidelines should be regularly updated to reflect changes in the regulatory environment.

Reduce Compliance Costs

Introduce Fee Waivers or Reductions: To encourage the use of SPVs, especially for small and medium-sized enterprises (SMEs), the government should consider introducing fee waivers or reductions for SPV registration, licensing, and annual returns. Promote Digital Platforms: Regulatory authorities should invest in digital platforms to submit compliance documents and pay fees. This would reduce administrative burdens and lower compliance costs for SPVs.

Enhance Enforcement Mechanisms

Strengthen Regulatory Capacity: Regulatory authorities such as the SEC, CBN, and ICRC should be provided with additional resources, including funding, personnel, and training, to enhance their capacity to monitor and enforce compliance with SPV regulations. Impose Stiffer Penalties for Non-Compliance: Regulatory authorities should impose stiffer penalties for violations of SPV regulations to deter non-compliance. These penalties should be proportionate to the severity of the violation and consistently enforced.

Improve Tax Clarity and Efficiency

Clarify Tax Exemptions: The Federal Inland Revenue Service (FIRS) should issue clear guidelines on the application of tax exemptions for SPVs under Section 29(8) of the Companies Income Tax Act (CITA). This would reduce uncertainty and disputes over tax obligations. Avoid Double Taxation: The government should review the tax treatment of SPVs to eliminate instances of double taxation, particularly in cross-border transactions involving foreign investors.

Build Awareness and Expertise

Conduct Training Programs: Regulatory authorities, in collaboration with industry associations, should conduct training programs for SPV managers, investors, and other stakeholders on the legal and regulatory requirements for SPVs. These programs should cover corporate governance, risk management, and compliance topics. Promote Knowledge Sharing: Establish platforms for knowledge sharing and best practices among SPV stakeholders, such as annual conferences, webinars, and online forums. This would help build expertise and foster collaboration in the SPV market.

Strengthen Dispute Resolution Mechanisms

Establish Specialised Tribunals: The government should establish specialised tribunals or arbitration centres to handle disputes involving SPVs. These tribunals should have the expertise to resolve complex issues related to securitisation, structured finance, and PPPs. Encourage Alternative Dispute Resolution (ADR): Promote ADR mechanisms, such as mediation and arbitration, to resolve disputes involving SPVs. ADR is often faster and less costly than litigation, making it an attractive option for stakeholders.

Promote Investor Confidence

Enhance Transparency: Regulatory authorities should enforce strict transparency requirements for SPVs, including publishing audited financial statements, transaction details, and risk assessments. This would enhance investor confidence and attract more capital to the SPV market. Introduce Investor Protection Measures: Develop and implement investor protection measures, such as mandatory risk disclosures, credit ratings for asset-backed securities, and insurance for SPV transactions. These measures would reduce the risks associated with investing in SPVs.

Leverage Technology for Compliance and Monitoring

Adopt RegTech Solutions: Encourage using regulatory technology (RegTech) solutions to automate compliance processes, such as reporting, record-keeping, and risk monitoring. This would reduce the administrative burden on SPVs and improve the efficiency of regulatory oversight. Implement Blockchain Technology: Explore the use of blockchain technology to enhance transparency and traceability in SPV transactions. Blockchain can provide a secure and immutable record of transactions, reducing the risk of fraud and improving stakeholder trust.

Foster Public-Private Collaboration

Encourage Stakeholder Engagement: Regulatory authorities should engage with industry stakeholders, including SPV managers, investors, and legal and financial advisors, to identify challenges and develop solutions. This collaborative approach would ensure that regulations are practical and effective. Promote PPPs for Infrastructure Development: The government should actively promote using SPVs in PPPs for infrastructure development. This would involve providing incentives, such as tax breaks and guarantees, to attract private sector participation in infrastructure projects.

 



[1] Damilola Bamisile, A Critical Analysis of the Company and Allied Matters Act 2020- The Latest Development <https://www.aaachambers.com> accessed 28 March 2025.

[2] Companies and Allied Matters Act, 2020, Sections 22 and 24

[3] Companies and Allied Matters Act, 2020, Sections 7 and 33

[4] Companies and Allied Matters Act, 2020, section 247

[5] Companies and Allied Matters Act, 2020, Section 293

[6] Companies and Allied Matters Act, 2020, Section 331

[7] Companies and Allied Matters Act, 2020, Sections 370 and 371

[8]  Section 271 of CAMA 2020.

[9] Sections 417-425 of CAMA.

[10] Sections 379 of CAMA 2020.

[11] Section  41 & 868 of CAMA 2020

[12] Section  18(2) of CAMA 2020.

[13] Such as the Securities and Exchange Commission (SEC) (SEC Rules, 2013) for capital market participation, and Section 271of CAMA 2020.

[14] Nigerian Code of Corporate Governance (NCCG), 2018

[15] Companies and Allied Matters Act 2020, s21 ((1)- (3))

[16] ibid s18 ((1)-(3))

[17] ibid s27

[18] ibid s 80

[19] Infrastructure Concession Regulatory Commission (Establishment, etc.) Act 2005, s14

[20] ibid s 1

[21] ibid s1(2)

[22] ibid s2 (1) and (2)

[23] ibid s2 (3)

[24] ibid s 2 (4)

[25] ibid s 4(1)

[26] ibid s 4 (2)

[27] ibid s 6

[28] ibid s 7 (4)

[29] ibid s 7 (3)

[30] ibid s 9

[31] ibid s10

[32] ibid s 8

[33] ibid s 7 (2) (a)

[34] ibid s12

[35] ibid s 13

[36] Infrastructure Concession Regulatory Commission Act, 2005, Section 1

[37] Infrastructure Concession Regulatory Commission Act, 2005, Section 3

[38] Infrastructure Concession Regulatory Commission Act, 2005, Section 7

[39] Infrastructure Concession Regulatory Commission ,PPP Manual for Nigeria < https://www.icrc.gov.ng> accessed  28 March 2025

[40] Public Procurement Act, 2007, Sections 5 and 6

[41]  (FIRS) (CITA, 2007; and VAT Act, 2007

[42] Nigerian Sovereign Investment Authority, Lagos-Ibadan  <https://nsia.com.ng> 21/03/2025

[43] Lekki Concession Company Limited  <ww.lcc.com.ng> 21/3/2025

[44] African Development Bank Group, Rail Infrastructure in  Africa: Financing Options < https://www.afdb.org> accessed 21 /03/2025

[45] Wasiu  Olaniyi,The proposed Eko Atlantic City project, Victoria Island, Lagos: Preliminary impact assessment of land reclamation on the aquatic lives and climate change <https://www.researchgate.net>121/3/2025

[46] Osinachi Nwandem, Securitisation and SPV: A Critical Assessment of the Asset Management Corporation of Nigeria (AMCON) < https://papers.ssrn.com> 21/03/2025

 

 

[47] BusinessDay. (2023). FG creates SPVs to boost participation of states in mining activities. BusinessDay NG. <https://businessday.ng/business-economy/article/fg-creates-spvs-boost-participation-states-mining-activities/> 21/03/2025

[48] SEC Nigeria,  sukuk (Islamic bond)  At A Glance <https://sec.gov.ng> 21/3/2025

[49] World Bank. (2018). *Public-Private Partnerships Reference Guide* (2nd ed.). Retrieved from [World Bank website](https://ppp.worldbank.org/public-private-partnership/).

[50] BoI. (2020). *Annual Report 2019*. Retrieved from [BoI website](https://www.boi.ng/).

 

[51] Adegbite, E. (2021). Regulatory Challenges in the Establishment and Management of SPVs in Nigeria. Journal of African Finance, 13(2), 45–60. See also Okoye, V. (2022). Inconsistent Enforcement of SPV Regulations: A Nigerian Perspective. African Journal of Economic Law, 11(1), 55–70.

[52] Uche, C. (2023). Enhancing Regulatory Capacity for SPVs in Nigeria. Journal of African Economic Law, 12(1), 40–55. Adeleke, O. (2020). Compliance and Capacity Challenges in Nigeria's SPV Market. Nigerian Journal of Business Law, 10(3), 22–35.

[53] Oladipo, T. (2021). Taxation and Dispute Resolution Challenges for SPVs in Nigeria. Journal of Nigerian Securities Regulation, 14(2), 10–25. See also Adegbite, E. (2021). Regulatory Challenges in the Establishment and Management of SPVs in Nigeria. Journal of African Finance, 13(2), 45–60.

[54] Okoye, V. (2022). Inconsistent Enforcement of SPV Regulations: A Nigerian Perspective. African Journal of Economic Law, 11(1), 55–70. See also Uche, C. (2023). Enhancing Regulatory Capacity for SPVs in Nigeria. Journal of African Economic Law, 12(1), 40–55.

[55] Adeleke, O. (2020). Compliance and Capacity Challenges in Nigeria's SPV Market. Nigerian Journal of Business Law, 10(3), 22–35. See also Oladipo, T. (2021). Taxation and Dispute Resolution Challenges for SPVs in Nigeria. Journal of Nigerian Securities Regulation, 14(2), 10–25.

[56] Adegbite, E. (2021). Regulatory Challenges in the Establishment and Management of SPVs in Nigeria. Journal of African Finance, 13(2), 45–60. See also Uche, C. (2023). Enhancing Regulatory Capacity for SPVs in Nigeria. Journal of African Economic Law, 12(1), 40–55.

[57] Okoye, V. (2022). Inconsistent Enforcement of SPV Regulations: A Nigerian Perspective. African Journal of Economic Law, 11(1), 55–70. See also Adeleke, O. (2020). Compliance and Capacity Challenges in Nigeria's SPV Market. Nigerian Journal of Business Law, 10(3), 22–35.

[58] Oladipo, T. (2021). Taxation and Dispute Resolution Challenges for SPVs in Nigeria. Journal of Nigerian Securities Regulation, 14(2), 10–25. See also Uche, C. (2023). Enhancing Regulatory Capacity for SPVs in Nigeria. Journal of African Economic Law, 12(1), 40–55.